Honest answers to the questions homeowners ask before hiring a general contractor in Tampa Bay.

General

About Drome Contracting

Are you licensed and insured?

Yes. Drome Contracting Services Inc holds Florida Certified General Contractor license CGC1515971. We carry $1M in general liability insurance and maintain workers compensation coverage for all employees. You can verify our license on the Florida DBPR website.

What areas do you serve?

We serve homeowners across four counties: Pasco, Hillsborough, Pinellas, and Hernando. That covers more than 20 cities including Odessa, Tampa, Trinity, Wesley Chapel, Clearwater, Brandon, Lutz, Riverview, and Spring Hill.

How do I get started?

Fill out the contact form or call us. We call back within one business day. We will ask about your project, schedule a free on-site estimate, and provide a detailed, line-item bid. No sales pitch. No obligation.

Do you offer financing?

We do not offer direct financing. However, we work with homeowners on phasing projects to spread costs over time. We can also provide the documentation your lender needs for construction loans or home equity lines of credit.

What is your warranty?

We stand behind our workmanship. Specific warranty terms are provided in your contract. Manufacturer warranties on materials and equipment are separate and passed through to you. Contact us for details on warranty coverage for your specific project.

Local Knowledge

Building in Tampa Bay

What is the Florida Building Code and how does it affect my project?

The Florida Building Code (FBC) 8th Edition governs all residential construction in the state. It includes wind mitigation requirements specific to your wind speed zone, energy conservation standards (minimum R-30 ceiling insulation, SEER 15+ HVAC), and structural specifications for hurricane resistance. Every project Drome Contracting builds meets or exceeds the current FBC. The code is updated on a three-year cycle, so requirements may change between when you start planning and when you pull permits.

Is sinkhole testing required before construction in Pasco or Hernando County?

Geotechnical soil testing is strongly recommended and often required by county building departments before new construction in areas with documented sinkhole risk. Both Pasco County and Hernando County sit on limestone substrate that can develop subsurface voids. The geotechnical report determines foundation type: standard monolithic slab, deep footings, compaction grouting, or pin piles. Drome Contracting orders this report before designing any new foundation in these counties.

How does Florida's high water table affect foundation work in Tampa Bay?

Much of the Tampa Bay area sits on sandy soil with a water table that can be just a few feet below grade. This is especially pronounced in South Tampa, Davis Islands, and bayfront properties. High water table conditions require engineered drainage, proper compaction, and sometimes raised stem wall foundations instead of standard monolithic slabs. During the rainy season (June through October), dewatering may be needed during excavation. Drome Contracting performs site-specific soil analysis before any foundation work.

Do I need a flood zone elevation certificate?

If your property falls within a FEMA-designated flood zone, yes. Elevation certificates are common requirements for properties in South Tampa, Davis Islands, Clearwater Beach, and New Port Richey waterfront areas along the Pithlachascotee River. The certificate documents your property elevation relative to the base flood elevation (BFE) and determines whether your foundation must be raised. Drome Contracting orders elevation certificates and designs foundations to meet or exceed BFE requirements.

What is the 50% rule for renovations in flood zones?

If your renovation cost exceeds 50% of your home's pre-renovation market value and the property is in a FEMA flood zone, the entire structure must be brought into current flood code compliance. This "substantial improvement" threshold applies throughout Hillsborough and Pinellas coastal areas, along the Alafia River in Riverview, and the Pithlachascotee River corridor in New Port Richey. Drome Contracting calculates this threshold during project planning so you understand the full scope before committing to a renovation.

How long does the permit process take in Pasco County vs Hillsborough County?

Pasco County Building Construction Services processes permits through the PascoGateway portal, with timing based on permit type, completeness, and required departments. Hillsborough County Development Services uses the HillsGovHub portal, and related county review cycles commonly use 15 business days for agency review plus up to 10 working days for resubmittals. Pinellas County processes through Accela Citizen Access and publishes current review-time dashboards. Drome Contracting submits to the correct portal and manages the review process for you, regardless of which county your property is in.

What is a wind mitigation inspection and do I need one?

A wind mitigation inspection documents the hurricane-resistant features of your home: roof-to-wall connections, roof covering, roof deck attachment, and opening protection (impact windows or shutters). While not required for construction, the inspection report can significantly reduce your homeowner insurance premium. New construction automatically meets current wind mitigation standards. For renovations, Drome Contracting can incorporate wind mitigation upgrades that qualify your home for insurance discounts.

Are there HOA restrictions for construction in Wesley Chapel or Land O' Lakes?

Yes. Master-planned communities like Connerton and Bexley in Land O' Lakes, and nearly every neighborhood in Wesley Chapel, have architectural review boards that must approve exterior modifications before county permits are even submitted. Interior renovations are typically unrestricted. Drome Contracting reviews your HOA covenants, prepares architectural review submittals with renderings and material specs, and coordinates HOA approval alongside Pasco County permitting to avoid delays.

What types of insurance should my general contractor carry?

At minimum, your general contractor should carry general liability insurance ($1M is the industry standard), workers compensation coverage for all employees, and automobile liability for company vehicles. Drome Contracting carries $1M in general liability and maintains active workers compensation. Ask any contractor for a certificate of insurance before signing a contract. If they hesitate or cannot produce one, that is a major red flag.

Does Florida require hurricane impact windows for remodels?

It depends on the scope. If you are replacing more than 25% of the glazed openings (windows and doors) in your home, Florida Building Code requires all replaced openings to meet current impact-rated or wind-borne debris protection standards. Full new construction always requires impact-rated openings in wind-borne debris regions. Even when not required, impact windows reduce insurance premiums and eliminate the need for shutters. Drome Contracting advises on the code threshold for your specific project.

Custom Home Construction

Custom Home Construction Questions

How long does it take to build a custom home in Tampa Bay?

Ask for a schedule covering lot and design work, approvals, procurement, construction and final occupancy requirements. Size, structural complexity, selections, reviewer comments and deliveries affect the dates. Compare those dependencies rather than relying on a general eight-to-fourteen-month duration for every Tampa Bay home.

Do I need to own a lot before contacting you?

You can begin planning while considering a lot. Bring the available survey and parcel information and ask which zoning, access, utilities, soil, drainage and approval questions need resolution before purchase or design. A preliminary discussion is not a buildability determination for the Tampa Bay property.

What is included in a written, itemized contract?

It should define construction, professional services, materials, labor, trade work, approval fees, inspections and completion responsibilities. Identify selected products, allowances, exclusions and assumptions separately, along with how changes affect price and timing. An itemized contract does not make unknown conditions disappear.

What wind mitigation features does Florida Building Code require for new homes in Tampa Bay?

Have the designer identify the site-specific wind loads and show the roof-to-wall connections, roof assembly, opening protection and any garage-door requirements on the plans. Ask how those details will be installed and inspected. A generic list of straps, shutters or roof barriers is not the specification for every Tampa Bay home.

How does Florida sandy soil and a high water table affect my foundation in Tampa Bay?

The site investigation should establish actual ground and groundwater conditions. Ask the designer whether compaction, drainage, footing changes or a deep-foundation option such as engineered piers needs evaluation for the proposed loads. Sand, high groundwater or limestone cannot be diagnosed from the Tampa Bay address alone. Confirm who obtains any needed report before choosing a foundation.

Are hurricane impact-rated windows required for new construction in your County?

Have the required opening protection established for the address and building design, then compare accepted products or systems and their approval documents. Impact glazing and shutters are different approaches, not an automatic countywide glass mandate. Ask the insurer separately whether the completed scope qualifies for any documented credit.

How does Florida rainy season affect new home construction timelines?

Weather can affect site work, concrete placement, framing, roofing, deliveries and safe access. Ask which stages are exposed, how materials and partly built work will be protected, and how shutdowns and restarts change the schedule. A late-fall or winter start does not guarantee a fixed number of weeks saved.

What energy code requirements apply to new homes in Tampa Bay?

Ask the design team which energy-code edition, compliance path, equipment specifications and tests apply to this home. Review ceiling and wall insulation, window ratings, heating-and-cooling performance and any required tests of building air leakage or duct leakage together. Confirm the accepted documentation before final occupancy rather than using universal R-30, R-13 or SEER figures.

Home Renovation

Home Renovation Questions

Can I stay in my home during a renovation in Tampa Bay?

Discuss occupancy by stage, including dust, noise, safe access, utilities, bathrooms and cooking facilities. Surface work may be less disruptive than structural work, but neither label guarantees that staying is safe or practical. Ask when temporary relocation would be needed and how it affects the Tampa Bay schedule.

How long does a full home renovation take?

Ask for separate design, approval, ordering, demolition, structural, trade and finish milestones. The number of rooms, existing conditions, layout changes and inspection requirements affect those dates. A generic four-to-eight-week cosmetic or three-to-six-month structural range does not establish this project's duration.

Do you handle permits for renovations in your County?

Discuss permit coordination in the proposal, including applications, professional documents, fees, review responses, inspections and final records. Confirm the building department responsible for the Tampa Bay address and name who handles each task. A license alone does not define every service included in a contract.

What happens if my renovation uncovers termite damage in Tampa Bay?

If suspected termite damage is exposed, document the condition and have qualified professionals assess the cause, extent and required treatment or structural repair. Agree any additional design, approvals, price and timing before rebuilding or covering the area. Do not infer an active infestation or treatment method from a damaged piece alone.

What is the 50% rule for renovations in Florida flood zones?

Ask the local floodplain administrator whether substantial-improvement rules apply and how the relevant structure value, included work and cumulative local rules are determined. The 50% topic is not a universal formula based on half the whole property's market value. Obtain the applicable determination before fixing scope, elevation or foundation decisions.

My older Florida home has aluminum wiring or polybutylene plumbing. What should I know?

Have a qualified electrician or plumbing professional identify the actual material, condition and connections. Aluminum branch wiring and polybutylene supply piping need different assessments; neither can be evaluated solely from the home's decade. Compare any repair or replacement scope and approval requirements while access is planned, without assuming a fixed saving or that every system needs the same remedy.

Do I need to upgrade my electrical panel during a renovation in your County?

Have a qualified electrician assess the panel, equipment condition, existing loads and proposed additions. Include Federal Pacific or Zinsco identification and the actual service rating in that review if present. A 100-amp panel does not by itself determine the required new size; confirm calculations, utility coordination and applicable approvals before pricing an upgrade.

Should I worry about asbestos or lead paint in my pre-1980 Florida home?

Before disturbing suspect materials, have qualified professionals determine what assessment, testing and handling requirements apply. The pre-1978 lead-paint and pre-1980 asbestos questions are reasons to review the actual property and scope, not proof that a ceiling, tile, pipe insulation or siding contains a hazardous material. Include any required specialist work and approvals before demolition.

Kitchen Remodel

Kitchen Remodel Questions

How long does a kitchen remodel take in Tampa Bay?

Ask for design, review, ordering, demolition, trade, installation and final-inspection milestones. A surface refresh and a full layout change have different dependencies. Cabinet and appliance availability, countertop measurement and required checks affect the dates; a general two-to-four or six-to-ten-week range is not a promise for your Tampa Bay scope.

Can I use my kitchen during a remodel?

Discuss cooking access by stage. A surface refresh may allow limited use, while removal of cabinets, sink or appliances can require a temporary arrangement. Ask about safe equipment locations, power, ventilation, dust and utility interruptions. Confirm when the kitchen will be unavailable instead of assuming a four-to-eight-week period.

Do kitchen remodels require permits in your County?

Describe the actual wall, circuit, plumbing, gas, ventilation and surface changes to the responsible building department. Ask which approvals apply to the address and scope, including any proposed like-for-like work. Have the contract assign submissions and inspections rather than inferring a permit exemption from the word cosmetic.

How does Florida humidity affect kitchen cabinet and countertop choices?

Compare plywood and other cabinet-box materials, hardwood or thermofoil (a film finish applied to a door) doors, edge protection and installation requirements using actual product specifications. For quartz, granite, other stone or butcher block, compare care, sealing, heat and water-exposure requirements. Ventilation and moisture control matter, but no universal indoor-humidity percentage or material label establishes performance for every kitchen.

What if my kitchen remodel uncovers termite or water damage in Tampa Bay?

Document the observed damage and have qualified professionals assess the cause and extent before rebuilding. Ask what structural design, treatment, drying or approval work is needed and how changes will be priced and approved. Sink areas and exterior walls are places to investigate where indicated, not proof that every kitchen has hidden damage.

Do I need a permit just to replace kitchen cabinets in your County?

Ask the authority about the proposed cabinet removal and installation, including any changed sink, gas connection, island circuits or outlets. Same-position cabinets and a layout change can have different scopes, but the cabinet label alone does not determine permit requirements. Confirm approvals before dependent work begins.

Should I budget for hurricane impact windows as part of my kitchen remodel?

Compare the window work as a defined addition to the kitchen scope: unit specifications, opening condition, installation, finishing and approvals. Have required opening protection established for the address. Ask the insurer about actual qualification and credits separately. Remodeling timing does not guarantee the best price, a generic per-opening cost or an insurance saving.

Can I add a gas line for a range during my kitchen remodel in Tampa Bay?

First confirm the available fuel service, selected appliance, routing, ventilation and work needed. Ask the utility, qualified installer and building department about applicable approvals and responsibilities, then include the connection and dependent cabinet or finish work in the proposal. A generic route estimate does not price the actual installation.

Bathroom Remodel

Bathroom Remodel Questions

How long does a bathroom remodel take in Tampa Bay?

Ask for design, approval, ordering, demolition, trade, waterproofing, tile and final-inspection dates for the actual scope. A surface update and a new layout have different dependencies. Confirm drying, curing and testing requirements for selected systems instead of treating a general two-to-three or four-to-six-week range as a completion promise.

Why is waterproofing so important in Florida bathrooms?

Tile and grout are not a complete waterproofing plan. Specify the wet-area backer, membrane, drain connections and penetrations together, then confirm preparation, installation and required testing before the work is covered. A membrane behind every tile surface is not a universal specification for every room or assembly.

Can you make a bathroom ADA-accessible?

Discuss the actual user's needs and which accessibility standards, if any, apply to the project. Walk-in or curbless showers, grab bars, clear doorways, fixture heights and roll-under vanities need coordinated dimensions and support details. A feature list alone does not establish ADA compliance for a private bathroom.

How should ventilation be sized for my bathroom in Tampa Bay?

Discuss moisture from bathing and how the current exhaust performs. Fan capacity should be assessed with the room, duct resistance, discharge route, controls and applicable requirements. Ask a qualified professional to specify the complete installation. A quiet or continuous-run fan is an option to evaluate, not a universal remedy. Do not use a fixed airflow-per-floor-area rule or a months-to-mold prediction as the specification.

What should I look for behind tile in a Florida bathroom remodel?

Assess what is exposed: backer condition, signs of water entry, deteriorated framing or possible pest damage. Document the cause and extent before choosing repair or treatment. Green board, cement board or visible staining alone does not establish the condition behind the whole wall. Agree added scope and approvals before waterproofing covers the affected area.

Are heated bathroom floors worth it in Florida?

Treat radiant floor heat as a comfort choice. Compare the specific system, electrical work, floor assembly, controls and installation cost, then ask how it affects tile and inspection work. Use product energy information and your expected usage to consider operating expense. Do not assume a generic installation price, minimal running cost or added resale value.

What aging-in-place features can you add to a bathroom remodel in Tampa Bay?

Consider curbless access and drain layout, wall support for grab bars, fixture height, lever handles, door clearances and the selected flooring's slip performance. Match the details to the user and available space. Plan future support if useful, but do not assume these features eliminate every later renovation or meet a standard without a design check.

Do I need a permit for a tub-to-shower conversion in your County?

Describe the drain, supply, shower system, electrical and ventilation changes to the responsible building department. Ask which permits, drawings and inspections apply to the address and scope. A conversion does not always mean the drain is relocated, so price and approvals should follow the actual proposed work.

Room Addition

Room Addition Questions

How long does a room addition take in Tampa Bay?

Ask for design, site review, approvals, ordering, foundation, framing, trade, finish and final-inspection milestones. A single room and a suite with a bathroom or kitchenette have different dependencies. A general two-to-four or three-to-six-month range does not set a completion date for the Tampa Bay project.

Will a room addition match my existing home?

Compare roof pitch, siding profile, trim, window proportions and floor elevations in the drawings and samples. Ask what exact matches are available and how the design handles any intentional contrast. Agree those details before framing rather than assuming the finished addition will be indistinguishable from the existing house.

Do I need an architect for a room addition?

Ask the authority and design team which professional drawings are required for the actual scope. A bedroom, office, complex connection and second-story design need different assessments. Identify who prepares and takes responsibility for the plans; do not assume a simple-room label removes the need for qualified design work.

What setback requirements apply to room additions in your County?

Have the boundary, existing buildings, easements, proposed footprint and applicable zoning limits reviewed for the parcel. Side, front, rear and any water-related limits need the authority's answer; generic setback figures are not a determination for every your County address. Resolve any conflict before finalizing the layout.

How do Florida wind load requirements affect room addition framing?

Have the designer establish the applicable wind loads and show the load path (how structural forces reach the foundation), roof-to-wall connections, sheathing, fastening and opening protection. The connection to the existing building needs to be part of that design. Do not treat one strap or nailing recipe as the specification for every addition.

Can my existing HVAC system handle a room addition in Tampa Bay?

Have a qualified professional assess the room's heating-and-cooling load, existing capacity and distribution. A 200-to-400-square-foot concept is an example to calculate, not evidence of overload. Compare the documented result with extending the current system, upgrading it or adding supplemental equipment such as a mini-split.

Do I need a survey before building a room addition in your County?

Ask the authority which survey or site information is required for the application and whether the existing records are adequate. The plan needs to locate the proposed work in relation to boundaries, easements and development limits. Age alone does not determine whether a new survey is required; confirm any updating or measurement needed.

Can you build a second-story addition over my existing Florida slab foundation?

Have a structural engineer or other qualified design professional assess the existing foundation, walls, framing and proposed load path before deciding. Any strengthening must follow that design. Steel supports, footing work or engineered piers are possibilities to evaluate, not a standard prescription for every Florida slab. Confirm investigation and design costs before treating a construction estimate as final.

Window & Door Replacement

Window & Door Replacement Questions

Do I need a permit for window replacement in Tampa Bay, FL?

Confirm the proposed replacement and any wall or opening changes with the authority responsible for the Tampa Bay address. Ask which applications, product approvals and inspections apply, then identify who handles them in the contract. Keep final records; a permit does not establish an automatic insurance or sale result.

What is the Florida Building Code requirement for impact windows in your County?

Have the applicable wind design, opening protection and design pressure established for the actual building and scope. A your County label does not establish High-Velocity Hurricane Zone classification or a universal product specification. Compare accepted products or systems and their installation requirements with the approved design.

How long does window and door replacement take in Tampa Bay?

Separate design and approval work, supplier production and delivery, installation, opening repairs and final inspection. Count and measure the units and identify custom sizes, access constraints and finishing. Ask for current dates and dependencies rather than assuming a two-to-five-day whole-house or one-to-two-day partial installation plus a fixed review period.

What is the difference between impact windows and hurricane shutters?

Compare the actual accepted systems for the property. Impact glazing remains in place, while shutters have model-specific storage, deployment or closure requirements. Check operation, maintenance, installation, appearance and the chosen system's documented performance. Neither label alone guarantees lower bills, noise reduction, resale value or a lower total price.

Will impact windows lower my homeowner's insurance in Tampa Bay?

Ask the insurer to assess the proposed scope and quote the actual premium effect for your policy. Confirm qualification, inspection and records needed after completion. A partial or whole-house package does not automatically qualify, and a general ten-to-twenty-five-percent wind-premium range should not be treated as guaranteed savings.

What does a Notice of Acceptance (NOA) mean for impact windows?

A Miami-Dade Notice of Acceptance, or NOA, is a particular product approval record. Florida product approvals and accepted local approval routes are not the same document or issuer. Check the exact selected model, listed limitations, design pressure and installation instructions against the project requirements before ordering; do not require an NOA label as the only possible approval path.

Can you replace just a few windows in Tampa Bay instead of doing the whole house?

Partial replacement is a scope to discuss. Compare the condition and use of the selected openings with phasing, finish matching, future product availability, fees and crew setup. Ask the authority about approvals and the insurer about qualification requirements separately. Replacing a few units does not establish a whole-house protection or insurance outcome.

What are the energy efficiency benefits of impact windows in your County?

Compare documented thermal ratings and installation with the existing units, opening area, orientation, shading and household use. Solar Heat Gain Coefficient, or SHGC, describes solar heat transfer; U-factor (a measure of heat transfer through the unit) and air leakage address other performance questions. Impact resistance is separate. Request a supported energy comparison rather than assuming a ten-to-twenty-percent cooling-cost reduction for every Tampa Bay home.

Permits

Permit Questions

Do I need a permit for my project?

Most construction projects in Florida require permits. New construction, room additions, structural changes, plumbing, electrical, and mechanical work all require permits. Cosmetic work like painting, replacing hardware, or installing flooring typically does not. We evaluate your scope and pull every required permit. Visit our permits page to learn more about the process.

Who pulls the permits?

We do. Permit applications, plan submissions, inspection scheduling, and code compliance are all part of our scope. The cost of permits is included in your contract. You never visit the county office. Learn more about our full permit management process.

What counties do you pull permits in?

We pull permits in Pasco County (PascoGateway), Hillsborough County (HillsGovHub), Pinellas County (Accela Citizen Access), and Hernando County. We know each county process, portal, and inspection office.

Your Neighbors Asked

Questions from Homeowners in Your Area

Do I need a flood elevation certificate for my Tampa lot?

If your lot falls within a FEMA-designated flood zone, yes. This is common in South Tampa, Davis Islands, and properties near the Hillsborough River. Drome Contracting orders the elevation certificate and designs your foundation to meet or exceed the required base flood elevation.

Learn more about Custom home construction in Tampa →

Do flood zone rules apply to interior renovations in New Port Richey?

If your renovation exceeds 50% of the home's market value and the property is in a FEMA flood zone, the entire structure may need to be brought into current flood compliance. This is common along the Pithlachascotee River. Drome Contracting evaluates this threshold before finalizing your renovation scope.

Learn more about Home renovation in New Port Richey →

Do Connerton or Bexley HOAs affect kitchen remodels?

Interior kitchen work is unrestricted by HOA rules. However, if your remodel includes adding or changing exterior vents, range hood exhaust outlets, or kitchen windows, the HOA architectural review board must approve those changes. Drome Contracting handles the approval process alongside Pasco County permitting.

Learn more about Kitchen remodels in Land O' Lakes →

What hidden problems should I expect in a Brandon bathroom remodel?

The most common surprise in Brandon homes from the 1980s and 1990s is water damage behind fiberglass tub/shower surrounds. The original installations often lacked proper waterproof membrane, allowing decades of moisture to reach the wall studs. We budget demo-day contingency into every project for this reason.

Learn more about Bathroom remodels in Brandon →

What materials hold up best in a Clearwater Beach bathroom?

Porcelain tile, solid-surface countertops, and marine-grade stainless or brass hardware resist salt air corrosion far better than standard chrome or builder-grade finishes. We also recommend closed-cell spray foam in exterior walls to block moisture infiltration from the coastal environment.

Learn more about Bathroom remodels in Clearwater →

How do Tampa setback requirements affect room additions?

The City of Tampa enforces side, rear, and front setbacks that vary by zoning district. In older neighborhoods like Seminole Heights, lots are narrow and setbacks can limit addition size. In New Tampa and Citrus Park, larger lots offer more flexibility. Drome Contracting pulls a boundary survey and confirms setbacks before designing your addition.

Learn more about Room additions in Tampa →

Does sinkhole risk affect custom home construction in Spring Hill?

It affects foundation design, not feasibility. Hernando County sits on limestone, and sinkhole activity is a documented concern. Drome Contracting orders a geotechnical soil report before designing your foundation, and we engineer the slab and footings to address whatever the report reveals. This is standard practice for responsible builders in the area.

Learn more about Custom home construction in Spring Hill →

How do I determine which county my Lutz home is in for permits?

Check your property tax bill or search the Hillsborough and Pasco County property appraiser websites. This is not just a formality: the two counties have different fee structures, inspection processes, and code enforcement approaches. Drome Contracting verifies jurisdiction and handles the correct permit process for your property.

Learn more about Home renovation in Lutz →

Still Have Questions?

We would rather answer your questions before you hire us than after. Call or fill out the form. We call back within one business day.